I. Final Checklist
WARNING
CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after installation. Make sure that none have fallen into the storage bin.
1)Is the icemaker level?
2)Is the icemaker in a site where the ambient temperature is within 45°F to 100°F (7°C to 38°C) and the water temperature within 45°F to 90°F (7°C to 32°C) all year around?
3)Is there at least 6" (15 cm) clearance at rear and sides and 24" (61 cm) at the top of the icemaker for proper air circulation ease of maintenance and service?
4)Have the shipping carton, tape, and packing material been removed from the icemaker?
5)Are all components, fasteners, and thumbscrews securely in place?
6)Have all electrical and water connections been made? Do electrical and water connections meet all national, state, and local code and regulation requirements?
7)Has the power supply voltage been checked or tested against the nameplate rating? Has a proper ground been installed to the icemaker? On remote
8)Are the water supply line
Note: The icemaker may stop running when the water supply is off, or if the pressure is below 10 PSIG. When the proper water pressure is reached, the icemaker automatically starts running again.
9)Are the compressor
to make sure they do not rub or touch other lines or surfaces? Has the fan blade (if applicable) been checked to make sure it turns freely?
10)On remote
11)On remote
12)Has the end user been given the instruction manual, and instructed on how to operate the icemaker and the importance of the recommended periodic maintenance?
13)Has the end user been given the name and telephone number of an authorized service agent?
14)Has the warranty card been filled out and forwarded to the factory for warranty registration?
30