Hoshizaki JWE-2400CUA-R-25B, JWE-24000CUA-L-25B E. Removal and Replacement of Conveyor

Models: JWE-2400CUA-R-25B JWE-24000CUA-L-25B

1 79
Download 79 pages 58.49 Kb
Page 61
Image 61
E. Removal and Replacement of Conveyor

E. Removal and Replacement of Conveyor

1)Remove the 4 bolts (2 at rear, 2 at both sides) securing the rear rack rail.

2)Hold the conveyor, and lift off the rear rack rail.

3)Take out the conveyor.Slider

4)Remove the left and right frames from the conveyor.

5)Remove the 5 nuts each of the conveyor rails to release the hooks and the bearings.

6)To replace, reverse the above procedure.

Note: Be careful of the slider direction when fitting the conveyor on the crankshaft slider.

7)

Adjust the reed switch position.

• Push out the wider side

8)

Make a trial run, and check for water leaks.

• Face the reinforcing rib side down

Align the end of reed switch to the center of hole

Reed Switch

< Front View >

Roller

Frame

Rack Rail

Rack Rail

Conveyor Conveyor

Frame

Hook

Bearing

Roller

Remove nuts

Frame

56

Page 61
Image 61
Hoshizaki JWE-2400CUA-R-25B, JWE-24000CUA-L-25B service manual E. Removal and Replacement of Conveyor