Hoshizaki JWE-2400CUA-R-25B, JWE-24000CUA-L-25B Connector Tube B Operation Board Tube A

Models: JWE-2400CUA-R-25B JWE-24000CUA-L-25B

1 79
Download 79 pages 58.49 Kb
Page 65
Image 65
2.Operation Board

3)Disconnect the control board connectors from the control board.

4)Slide out the control board.

5)Install the new control board.

6)To replace, reverse the above procedure.

2.Operation Board

1)Use the “ON/OFF” button on the operation panel to turn off the unit, then turn off the dishwasher and booster tank power supplies. Lockout/Tagout to prevent the power supplies from being turned back on inadvertently.

2)Remove the screws securing the operation box and the cable cover to the top of the dishwasher.

3)Remove the 4 screws from the bottom of the operation box, and remove the cover.

4)Remove the screws securing the stay - OP, joint - operation (B), and operation panel

(B).

5)Disconnect the connector for the operation board cable and the cable - operation.

6)Install the new operation board.

Note: Remove the 2.0 mm dia tube (A) from the inside groove of the old board, and attach the tube (A) to the new board.

7)To replace, reverse the above procedure.

Note: Make sure the tubes are snug inside the joint - operation (B) and operation panel

(B).

Stay - OP

Joint - Operation (B)

Operation Panel (B)

Cable - Operation

Connector Tube (B)

Operation Board

Tube (A)

60

Page 65
Image 65
Hoshizaki JWE-2400CUA-R-25B Operation Board, Stay - OP Joint - Operation B Operation Panel B Cable - Operation