Hoshizaki KM-630MRH 1Turn off the power supply 2Remove the panels, 6Install the new valve

Models: KM-630MAH KM-630MRH KM-630MWH

1 67
Download 67 pages 19.6 Kb
Page 52
Image 52
4)Remove the screw and the Solenoid.

IMPORTANT

Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

1)Turn off the power supply.

2)Remove the panels.

3)Recover the refrigerant and store it in an approved container.

4)Remove the screw and the Solenoid.

5)Disconnect the Hot Gas Valve or Line Valve using brazing equipment.

6)Install the new valve.

WARNING

Always protect the valve body by using a damp cloth to prevent the valve from overheating. Do not braze with the valve body exceeding 250°F.

7)Install the new Drier.

8)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

9)Evacuate the system, and charge it with refrigerant. For air-cooled and water- cooled models, see the Nameplate for the required refrigerant charge. For remote air-cooled models, see the Charge Label in the machine compartment.

10)Cut the leads of the Solenoid allowing enough lead length to reconnect using closed end connectors.

11)Connect the new Solenoid leads.

12)Attach the Solenoid to the valve body, and secure it with a screw.

13)Replace the panels in their correct positions.

14)Turn on the power supply.

52

Page 52
Image 52
Hoshizaki KM-630MRH, KM-630MWH, KM-630MAH 1Turn off the power supply 2Remove the panels, 4Remove the screw and the Solenoid