4. REMOVAL AND REPLACEMENT OF DRIER
IMPORTANT
Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.
1)Turn off the power supply.
2)Remove the panels.
3)Recover the refrigerant and store it in an approved container.
4)Remove the Drier.
5)Install the new Drier, with the arrow on the Drier, in the direction of the refrigerant flow. Use nitrogen gas at the pressure of 3 - 4 PSIG when brazing the tubings.
6)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
7)Evacuate the system, and charge it with refrigerant. For
8)Replace the panels in their correct positions.
9)Turn on the power supply.
5.REMOVAL AND REPLACEMENT OF EXPANSION VALVE
IMPORTANT
Sometimes moisture in the refrigerant circuit exceeds the Drier capacity and freezes up at the Expansion Valve. Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.
1)Turn off the power supply.
2)Remove the panels.
50