3)Recover the refrigerant and store it in an approved container.

4)Remove the insulation and the Expansion Valve Bulb on the suction line.

5)Remove the Expansion Valve Cover, and disconnect the Expansion Valve using brazing equipment.

6)Braze the new Expansion Valve, with nitrogen gas flowing at the pressure of 3 - 4 PSIG.

WARNING

Always protect the valve body by using a damp cloth to prevent the valve from overheating. Do not braze with the valve body exceeding 250°F.

7)Install the new Drier.

8)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

9)Evacuate the system, and charge it with refrigerant. For air-cooled and water- cooled models, see the Nameplate for the required refrigerant charge. For remote air-cooled models, see the Charge Label in the machine compartment.

10)Attach the Bulb to the suction line in position. Be sure to secure it with clamps and to insulate it.

11)Place the new set of Expansion Valve Covers in position.

12)Replace the panels in their correct positions.

13)Turn on the power supply.

6.REMOVAL AND REPLACEMENT OF HOT GAS VALVE AND LINE VALVE

CAUTION

Always use a copper tube of the same diameter and length when replacing the hot gas lines; otherwise the performance may be reduced.