B. Sequence of Operation
1. Sequence Cycles and Shutdown
The steps in the sequence are as outlined below. When power is supplied, the red "POWER OK" LED and the green "BC CLOSED" LED on the CB turn on (If yellow "BC OPEN" LED is on, the icemaker will not start. In this case clear ice away from BC actuator paddle in the storage bin area). A
a)1-Minute Fill Cycle
LED 4 is on. WV1 opens and the fill period begins. After
b)Initial Harvest Cycle
LEDs 1, 4 and 2 are on. Comp, FMRs, HGVs, X10 relay, WV2, X12 relay, and X13 relay energize. WV1 de‑energizes. CB monitors the warming of the evaporator via the thermistor located on the suction line. When the thermistor reaches 48°F (9°C), CB reads 3.9 kΩ from the thermistor and turns harvest termination over to the adjustable harvest timer (S4 dip switch 1 & 2). The harvest timer has settings of 60, 90, 120, and 180 seconds. The pump‑out timer (S4 dip switch 3 & 4) acts in place of the harvest timer during cycles with a
Harvest Pump Timer: LEDs 1, 3, and 2 are on. Comp, FMRs, HGVs, X10 relay, and
X13 relay continue. LED 4 turns off, WV2 and X12 relay
S4 dip switch 7 must remain in the factory default position of 7 on. Otherwise, PM will not energize during the last 50 seconds of harvest. The minimum total time allowed by CB for a complete harvest cycle is 2 minutes. At the end of harvest, CB checks position of F/S and proceeds to the freeze cycle if it is closed or calls for a
c)Freeze Cycle
LED 1 and LED 4 are on. Comp, FMRs, and PM remain energized. LLVs energize. WV1 and LED 4 energize for 1 min. HGVs, X10, X11, and X13 relays
13