Hoshizaki Condensing Unit Models SRK-14J/3, KMS-1401MLJ G Control Board Sequence Flow Chart

Models: Condensing Unit Models SRK-14J/3 KMS-1401MLJ

1 54
Download 54 pages 29.87 Kb
Page 15
Image 15
"G" Control Board Sequence Flow Chart

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"G" Control Board Sequence Flow Chart

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KMS-1401MLJ with SRK-14J/3

 

 

 

 

 

 

2.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sequence

Cycle

 

 

 

1. 1-Minute

 

 

2. Harvest Cycle

 

 

 

 

 

 

 

 

 

 

 

 

3. Freeze Cycle

 

 

 

4. Pump-Out Cycle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Steps

 

Fill Cycle

 

 

• WV2 time: 6 min. or the length of harvest minus 50 sec.

 

 

 

• Minimum freeze time: 5 min.

 

Factory set for every

 

 

 

 

 

 

 

 

 

 

 

 

 

(S4 dip switch 7), whichever is shorter.

 

 

 

• Maximum freeze time: freeze timer setting

 

10th cycle.

 

 

 

 

 

 

 

 

 

 

 

 

• Maximum harvest time: 20 min.

 

 

 

 

(S4 dip switch 9 & 10).

 

 

 

 

(S4 dip switch 5 & 6)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thermistor

 

 

 

1 to 3-min. harvest timer in control

 

 

 

 

5-min. minimum

 

 

F/S in control

 

 

 

 

 

 

Flow

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

in control

 

 

 

 

 

(S4 dip switch 1 & 2)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chart

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

freeze timer in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Harvest Pump

 

 

 

 

control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Timer

 

 

 

Refill

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Startup

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50 sec.

 

 

1 min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F/S check

 

 

 

F/S closed

 

 

 

 

 

 

 

 

 

 

F/S check

 

 

 

 

F/S closed

 

 

 

 

 

 

F/S opens or freeze

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WV1 energized

 

 

Comp energized

 

 

 

PM energized

 

 

 

Comp continues

timer terminates

Comp continues

 

 

 

 

 

 

 

 

 

 

 

 

WV2 de-energized

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FMRs energized

 

 

 

 

 

 

FMRs continue

 

 

 

FMRs continue

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F/S open

 

 

HGVs energized

 

Thermistor temperature reaches

 

 

 

PM continues

 

 

 

HGVs energized

 

 

 

 

 

 

 

 

 

 

 

 

WV2 energized

 

 

 

 

LLVs energized

 

 

 

DV & PM de-energized 2 sec., then

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

48°F (9°C) (3.9 kor less).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WV1 de-energized

 

 

 

 

WV1 energized first 1 min. of freeze

 

energized for 10/20 sec.

 

 

 

 

 

 

 

 

 

 

 

 

Harvest timer starts (1 to 3 min.).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HGVs de-energized

 

 

 

LLVs de-energized

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F/S open

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If F/S is open, Comp stops and cycle returns to 1-min. fill.

Shutdown

 

1. Bin Full

 

and Restart

Shutdown Delay:

Fill Cycle – 15 sec. after activation.

Harvest Cycle – At the end of the harvest cycle, or up to 15 sec. into the freeze cycle if activated at the end of the harvest cycle.

Freeze Cycle – 15 sec. after activation if activated at least 15 sec. before the 5-min. short cycle protection timer terminates. Otherwise, at the end of the next harvest cycle.

BC Operation KMS-1401MLJ with SRK-14J/3Sequence

2.Icemaker Off

All components de-energized.

3.Ice Level Lowered

Icemaker starts at "1. 1-Minute Fill Cycle."

FlowTo 1 above

BC open (BC actuator paddle engaged)

Green "BC CLOSED" LED off

Yellow "BC OPEN" LED on

Legend:

Comp-compressor

DV-drain valve

FMRs-fan motors-remote

F/S-float switch

HGVs-hot gas valves (KMS and SRK)

LLVs-liquid line valves (KMS and SRK)

PM-pump motor

WV1-fill/refill water valve

WV2-harvest water valve

Yellow "BC OPEN" LED continues BC closed (BC actuator paddle disengaged)

All components de‑energized Green "BC CLOSED" LED on

Yellow "BC OPEN" LED off

Components Energized when the Control Switch is in the "SERVICE" Position

When in the "SERVICE" position, the control switch supplies power to the service switch and the icemaker is in service mode. The service switch has three positions: "DRAIN," "CIRC." and "WASH." See the information below for details of each function.

DRAIN

Power is supplied to the pump and drain valve. This drains the water tank.

 

 

CIRC.

Power is supplied to the pump only. This operation can be used to circulate cleaner and

 

sanitizer over the outside surface of the evaporator for extended periods of time.

 

 

WASH

Power is supplied to the pump and wash valve. This operation is used to circulate cleaner

 

and sanitizer over both the inside and outside surfaces of the evaporator.

 

 

Page 15
Image 15
Hoshizaki Condensing Unit Models SRK-14J/3 G Control Board Sequence Flow Chart, KMS-1401MLJ with SRK-14J/3