Hoshizaki KMS-1401MLJ c Pump-Out Timer S4 dip switch, d Pump-Out Frequency Control S4 dip switch

Models: Condensing Unit Models SRK-14J/3 KMS-1401MLJ

1 54
Download 54 pages 29.87 Kb
Page 20
Image 20

c)Pump-Out Timer (S4 dip switch 3 & 4)

The 1st pump-out occurs after the 11th freeze cycle, then every 10th cycle thereafter. When a pump-out is called for, the X10 relay is energized and the X13 relay is de‑energized to allow the drain valve to energize. The pump motor stops for 2 seconds, then the X11 relay energizes, allowing the pump motor and drain valve to energize. Water is removed from the bottom of the water tank and sent down the drain. At the same time, water flows through the small float switch tube to power flush the float switch.

The pump‑out drains the water tank for the time determined by the pump‑out timer. The pump‑out timer also acts in place of the harvest timer during cycles with a pump-out. The pump-out timer is factory set, and generally no adjustment is required. The pump-out timer control can be set to pump-out for 10 or 20 seconds.

S4 Dip Switch Setting

Time (seconds)

Inlet Water Valve

 

 

 

 

 

 

No. 3

No. 4

T1

T2

 

 

 

 

 

 

OFF

OFF

10

150

closed

 

 

 

 

 

ON

OFF

10

180

closed

 

 

 

 

 

OFF

ON

10

120

open if refill = 0; closed if refill 1 or greater

 

 

 

 

 

ON

ON

20

180

closed

 

 

 

 

 

T1: Time to drain the water tank

T2: Harvest timer at pump-out

d)Pump-Out Frequency Control (S4 dip switch 5 & 6)

The pump-out frequency control is factory-adjusted to drain the water tank every

10 cycles, and generally no adjustment is required. However, where water quality is bad and the icemaker needs a more frequent pump-out, the pump-out frequency can be adjusted as shown in the table below.

Timing of the first pump‑out is dependent on S4 dip switch 5 & 6 settings. See the table below.

S4 Dip Switch Setting

Pump-Out

1st Pump-Out

No. 5

No. 6

Frequency

 

 

 

 

 

OFF

OFF

Every cycle

After 2nd freeze cycle

 

 

 

 

ON

OFF

Every 2 cycles

After 3rd freeze cycle

OFF

ON

Every 5 cycles

After 6th freeze cycle

 

 

 

 

ON

ON

Every 10 cycles

After 11th freeze cycle

 

 

 

 

20

Page 20
Image 20
Hoshizaki KMS-1401MLJ service manual c Pump-Out Timer S4 dip switch, d Pump-Out Frequency Control S4 dip switch