T-STAT LOCATION

T-Stats are located within the electrical raceway.

Condensing Unit Installation Requirements

For proper operation of the Condensing Unit provide an opening with adequate exhause and intake as follows:

Up to 1 1/2 hp: minimum of 2 vents totalling 150 sq. in.

Over 1/2 hp: minimum of 2 vents totalling 150 sq. in. Self-Contained Model Installation - Low temperature merchandisers need to be connected to both a 120V / 60 Hz and 230V / 60 Hz electrical supply.

IGSSB-SCSS / SCSS-SL-0108

PIPING

For merchandisers with “electric” defrost, the suction and liquid lines should be clamped or taped together and insulated for a minimum of 30 feet. For models with “KOOLGAS®” defrost, suction, and liquid lines should not contact each other, and should be insulated separately for a minimum of 30 feet.With either type defrost, additional insulation for the balance of the liquid and suction lines is required wherever condensation and drippage would be objectionable.

The refrigerant line outlets are located under the fixture at the left end when viewed from the back. Insulate suction lines to prevent condensation dripping on the floor.

8

Page 8
Image 8