IBM 600X (MT 2646) manual Port replicator checkout, Checking the backup battery

Models: 600X (MT 2646)

1 82
Download 82 pages 35.89 Kb
Page 16
Image 16
Checking the backup battery:

Checkout guide

Checking the backup battery:

Do the following:

1.Power off the computer, and unplug the ac a from it.

2.Turn the computer upside down.

3.Remove the backup battery

Note: Removing the

backup battery

will

cause l

of

configuration

data unless

the

battery

is

installed

and

operational.

 

 

(see “Checking the battery pack” on page 11)

4.Measure the voltage of the backup battery. following figure.

Wire

Voltage

(V dc)

 

 

 

Red

+2.5

to+3.2

 

 

 

Black

Ground

 

 

 

 

Ÿ If the voltage is correct, replace the sys

ŸIf the voltage is not correct, replace the battery.

ŸIf the backup battery discharges quickly af replacement, replace the system board.

Port replicator checkout

Use the following procedure to isolate a port r problem. The port replicator attaches to the syst expansion connector at the rear of the computer:

1. Power off the computer.

2. Remove the failing devices from the port re

3.Unplug the AC Adapter from the port replicat attached.

4. Remove the port replicator from the computer.

5.Reconnect the failing device directly to the (If another device is already connected to computer, remove it first.)

6.Go to “Testing the computer” on page 7 and ru diagnostics.

7. If

the

advanced

diagnostic

device test

doe

an

error,

suspect

a problem

with the port

re

8.Power off the computer, and reconnect the po replicator.

9.Power on the computer, and run the following advanced diagnostic tests:

ŸSerial port test with the wrap plug install the port replicator

12 ThinkPad 600X Hardware Maintenance Manual

Page 16
Image 16
IBM 600X (MT 2646) manual Port replicator checkout, Checking the backup battery