STEP 13 (See Diagram 13 & 15)

A.)

Attach the Ball-end of the 102” Leg Curl Cable (#87) to the opening on the Leg Developer (#23).

 

Install a Pulley (#58) to the opening. Attach two Bushings (#56) to the holes on the Leg

 

Developer. Secure it with a M10 x 2 ½” Allen Bolt (#97) and M10 Aircraft Nut (#110).

B.)

Pull the Cable through the openings to the bracket on the Left Base Frame (#2). Install a Pulley.

 

Secure it with a M10 x 1 ¾” Hex Head Bolt (#92), two ¾” Washers (#106), and one M10 Aircraft

 

Nut (#110).

C.)

Continue drawing the cable through the opening on the bottom of the Left Vertical Beam (#4).

 

Install another Pulley.

D.)

Draw the Cable upward to the Double Floating Pulley Bracket (#30) previously installed in STEP

 

12B. Install another Pulley.

E.)

Pull the Cable downward to the Swivel Frame (#26). Install another Pulley.

F.)

Slide a Ring Cap (#80), Rubber Ball (#79) and 7/8” Washer (#78) onto the end of the Cable.

 

Screw a Connector (#48) onto the Cable. See E View.

 

DIAGRAM 13

18

Page 19
Image 19
Impex MWB CR 4 manual See Diagram 13