Intel user manual 100ECB-865User’s Manual

Models: ECB-865

1 112
Download 112 pages 25.96 Kb
Page 110
Image 110
100ECB-865 User’s Manual

User’s Manual

 

 

 

 

 

Code

Description

 

 

 

 

 

4B

The amount of memory above 1MB has been found and verified.

 

 

 

Checking for a soft reset and clearing the memory below 1MB for the

 

 

 

soft reset next.

 

 

 

If this is a power on situation, going to checkpoint 4Eh next.

 

 

4C

The memory below 1MB has been cleared via a soft reset. Clearing

 

 

 

the memory above 1MB next.

 

 

4D

The memory above 1MB has been cleared via soft reset. Saving the

 

 

 

memory size next. Going to checkpoint 52h next.

 

 

4E

The memory test started, but not as the result of a soft reset.

 

 

 

Displaying the first 64KB memory size next.

 

 

4F

Memory size display started. This will be updated during memory test.

 

 

 

Performing the sequential and random memory test next.

 

 

50

Memory testing/initialization below 1MB completed. Going to adjust

 

 

 

displayed memory size for relocation and shadowing.

 

 

51

The memory size display was adjusted for relocation and shadowing.

 

 

 

Testing the memory above 1MB next.

 

 

52

The memory above 1MB has been tested and initialized. Saving the

 

 

 

memory size information next.

 

 

53

The memory size information and the CPU registers are saved.

 

 

 

Entering real mode next.

 

 

54

Shutdown was successful. The CPU is in real mode. Disabling the

 

 

 

Gate A20 line, parity, and the NMI next.

 

 

57

The A20 address line, parity, and the NMI are disabled. Adjusting the

 

 

 

memory sizedepending on relocation and shadowing next.

 

 

58

The memory size was adjusted for relocation and shadowing. Clearing

 

 

 

the Hit <DEL> message next.

 

 

59

The Hit <DEL> message is cleared. The <WAIT…> message is

 

 

 

displayed. Staring the DMA and interrupt controller test next.

 

 

60

The DMA page register test passed. To do DMA#1 base register test.

 

 

62

DMA#1 base register test passed. To do DMA#2 base register test.

 

 

65

DMA#2 base register test passed. To program DMA unit 1 and 2.

 

 

66

DMA unit 1 and 2 programming over. To initialize 8259 interrupt

 

 

 

controller.

 

 

7F

Extended NMI sources enabling is in progress.

 

 

80

The keyboard test has started. Clearing the output buffer and checking

 

 

 

for stuck keys. Issuing the keyboard reset command next.

 

 

 

 

 

100ECB-865 User’s Manual

Page 110
Image 110
Intel user manual 100ECB-865User’s Manual