PLUMBING PREPARATION

NOTE: Locate the drain overflow so the PVC drain pipe will not exceed 4￿7inches in length.

Position the plumbing supplies and drain trap according to the roughing7in dimensions and the Custom BodySpa room design. Cap the supplies, and check for leaks.

 

INSTALL THE

TOWER MOUNTING

 

 

FRAME

 

 

 

 

 

On one of the tower mounting studs, draw a pencil

 

line exactly ￿￿7￿/￿7inches up from the subfloor.

 

 

You will use this mark to temporarily position the

 

tower mounting frame at the correct heightBe .

 

 

precise with this

measurement.

 

 

Remove the three 3/￿7inch tower bolts from the

 

 

locations shown, and carefully lift the tower out of

 

the mounting frame. Carefully set the tower aside

 

 

where it will not be damaged.

 

 

 

 

 

 

Position and level the mounting frame between

 

 

 

the tower mounting studs, and line up the

 

INSTALLATION

 

metal edge with the pencil line you drew on

 

 

 

 

 

the studs.

 

 

 

 

 

Loosely hold the mounting frame to the stud

 

 

 

framing with four of the ten drywall screws

 

 

 

provided. Do not turn the screws all the way

 

 

 

this

time.

 

 

 

 

 

 

 

 

 

 

 

 

Check Point

#2

 

 

 

 

- Plumbing supplies installed and capped.

 

 

 

 

- Tower mounting frame bottom edge positioned 1835/83inches

 

 

 

above the

subfloor.

 

 

 

 

 

- Tower mounting frame loosely mounted to studs.

 

 

 

 

 

 

 

 

 

 

INSTALL THE

PUMP BOX

 

 

 

 

 

The pump box contains a ￿7horsepower pump and

 

 

 

 

 

motor, along with the control box and an integral heater.

Remove the suction bracket assembly from the pump box. The suction bracket can later be installed in any chosen location within 4￿7inches of the pump box.

Fit the pump box between the false wall and face wall. Locate the pump box to maximize accessibility and so the pump inlet faces in the direction of your planned suction line. The pump box must be within

3￿7inches to either side of the tower so the tower and Waterfall cables will reach to the pump box. Do not secure the pump box in place at this time.

￿￿￿3477￿7AA (A)

￿3

Kohler Co., Kohler, WI

Page 12
Image 12
Kohler 116347-2 manual Plumbing Preparation, Install Tower Mounting Frame, Install Pump BOX