4-3. Operation Timing
•A specific function of image stabilization control is carried out as required according to the situation.
| Operating Timing |
| Processing | |
|
|
| ||
• When a new Image Transfer Belt |
| • Ds correction control | ||
| is detected |
| ||
|
| adjustment control | ||
• | When a new Drum Cartridge or |
| ||
| tion factor measurement control | |||
| Toner Cartridge is detected | A | ||
| image toner amount control | |||
• | When the environment changes |
| ||
| intensity adjustment control | |||
• | When 1,000 printed pages have |
| ||
| tion control | |||
| been produced*1 |
| ||
|
|
| ||
|
|
|
| |
• | When 200 printed pages have |
| • Solid image toner amount control | |
B | Laser intensity adjustment control | |||
| been produced*2 | |||
|
| correction control | ||
|
|
| ||
|
|
|
| |
• | When the processing is com- | C | • γ correction control | |
| manded from the Control Panel | |||
|
|
| ||
|
|
|
|
✽1: When 1,000 printed pages have been produced after A has been performed last.
✽2: When 200 printed pages have been produced after A and B have been performed last.
46