4-3. Operation Timing

A specific function of image stabilization control is carried out as required according to the situation.

 

Operating Timing

 

Processing

 

 

 

• When a new Image Transfer Belt

 

• Ds correction control -> LED intensity

 

is detected

 

 

 

adjustment control -> Belt surface reflec-

When a new Drum Cartridge or

 

 

tion factor measurement control -> Solid

 

Toner Cartridge is detected

A

 

image toner amount control -> Laser

When the environment changes

 

 

intensity adjustment control -> γ correc-

When 1,000 printed pages have

 

 

tion control

 

been produced*1

 

 

 

 

 

 

 

 

When 200 printed pages have

 

• Solid image toner amount control ->

B

Laser intensity adjustment control -> γ

 

been produced*2

 

 

correction control

 

 

 

 

 

 

 

When the processing is com-

C

γ correction control

 

manded from the Control Panel

 

 

 

 

 

 

 

1: When 1,000 printed pages have been produced after A has been performed last.

2: When 200 printed pages have been produced after A and B have been performed last.

46