Lennox International Inc G24-200 Cooling Sequence Of Operation, For Two Condensing Units

Models: G24-200

1 44
Download 44 pages 44.47 Kb
Page 44
Image 44
COOLING SEQUENCE OF OPERATION

COOLING SEQUENCE OF OPERATION

FOR TWO CONDENSING UNITS

FOR A SINGLE CONDENSING UNIT

THERMOSTAT CALLS FOR COOLING

(Y1 POWERED)

COOLING CONTACTOR OF FIRST-STAGE CONDENSING UNIT CLOSES AND SYSTEM BLOWERS START.

HAS ROOM AIR TEMPERATURE CONTINUED

TO RISE ABOVE THE THERMOSTAT"S

Y2 SET POINT?

YES

COOLING CONTACTOR OF SECOND-STAGE

CONDENSING UNIT CLOSES.

IS Y2 DEMAND SATISFIED?

YES

SECOND-STAGE COOLING

UNIT CONTACTOR OPENS

IS Y1 DEMAND SATISFIED?

YES

FIRST-STAGE COOLING UNIT

CONTACTOR OPENS AND B3

SYSTEM BLOWERS OFF.

THERMOSTAT CALLS FOR COOLING

(Y1 POWERED)

COOLING CONTACTOR OF CONDENSING UNIT

CLOSES AND SYSTEM BLOWERS START.

IS Y1 DEMAND SATISFIED?

YES

COOLING UNIT CONTACTOR

OPENS AND B3 SYSTEM

BLOWERS OFF.

MANUAL FAN OPERATION

MANUAL FAN SELECTION MADE AT THERMOSTAT.

THE BLOWERS RUN CONTINUOUSLY WITH OR WITHOUT A CALL FOR HEATING OR COOLING.

Page 44

Page 44
Image 44
Lennox International Inc G24-200 Cooling Sequence Of Operation, For Two Condensing Units, For A Single Condensing Unit