Table of Contents / Setup Checklist
Table of Contents
Safety Warnings | . . | . |
| 2 | System Setup | . | . | |
Important Safety Instructions | . . . | . | PCS150R Configuration Options. . . . . . . | |||||
Table of Contents / Setup Checklist . . | . | . | . | 6 | Troubleshooting / Specifications. . | . . . . 23 | ||
PCS150R Product Description . . . . | . | . | . 7 | Document Revision History / Notes . | . | . | . 24 | |
Rear and Front Panel Overviews . . . | . | . | . | 8 | Open Source Software Notice. . . | . . . . 25 | ||
Rack Installation | . . | . |
| 9 | Warranty | Back Cover | ||
|
|
|
|
|
|
|
|
|
Setup Checklist
Check the items listed below before you begin the PCS150R installation and setup procedures.
ASI Output (Optional)
__ If the system is using ASI ouput, install the modulator and upconverter that will receive the ASI output signal from the PCS150R. Refer to the manufacturer’s documentation.
PCS150R
__ Unpack the PCS150R Pro:Centric™ server unit and all accessories. Accessories provided: Power Cord and Adapter
__ Select the location for mounting the PCS150R. Ensure that adequate ventilation is available.
__ Obtain the necessary attachment hardware to mount the PCS150R chassis in its targeted location.
__ Plan and install the necessary cabling and network (Ethernet) and AC power access for the
PCS150R. You will also need the following to connect a PC directly to the PCS150R for system setup verification purposes:
•DB9
•(Optional) USB
__ Carefully follow the installation procedure for the PCS150R (see page 9). __ Complete the system setup for the PCS150R (see pages 10 to 12).
6 |