STEP 42:

33
FIGURE 42
LEG CABLE 43
50
53
Screw the threaded end of the LEG CABLE (43) approximately 1” into the end of the SELECTOR SHAFT (50) of the HEAD PLATE (53)
as shown in FIGURE 42.
• Insert one WEIGHT STACK PIN (75) into each weight stack on the 8500
GYM as shown in FIGURE 43.
FIGURE 43
• If upon completion of assembly, the HEAD PLATE (53) does not sit on top
of the first WEIGHT PLATE (106), push the HEAD PLATE (53) down,
insert the WEIGHT STACK PIN (75) and perform several repetitions at the
press station. This will relax the cable system and prevent the HEAD
PLATE (53) from lifting up.
• If after completing previous step, the HEAD PLATE (53) still does not sit
on top of the first WEIGHT PLATE (106) or if there is excess slack in the
cable system, adjust the threaded end of the CABLE accordingly and
retighten the jam nuts.
• If there is excess slack in the AB or PEC DEC cable system, adjust the
threaded end of the AB CABLE (45) accordingly and retighten the jam
nut.
75
106
53

STEP 43:

• Perform the following to all three WEGHT STACKS: