STEP 4:

FIGURE 4
9
LOOSELY assemble the MULTI PRESS FRAME (8) to the LEG PRESS FRAME (85) using eight RH CAPS (69), two 3/8 X 117mm BOL TS
(104), two 3/8 X 67mm BOLTS (55), eight 3/8” SAE WASHERS (66), eight 3/8” RH WASHERS (67) and four 3/8” LOW HEIGHT LOCK
NUTS (65) as shown in FIGURE 4. (NOTE: The two 3/8 X 117mm BOLTS (104) for this step are in the LEG PRESS hardwar e bag.)
55 3/8 X 67mm
58 3/8 X 90mm
65
67
66
69
8
10
85
LOOSELY assemble the MULTI PRESS FRAME (8) to TOWER BASE (10) using four RH CAPS (69), two 3/8 X 90mm BOL TS (58),
four 3/8” SAE WASHERS (66), four 3/8” RH W ASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 4.
104 3/8 X 117mm