STEP 2:

FIGURE 2
7
LOOSELY assemble the LEG PRESS FRAME (85) to the TOWER BASE (10) using four RH CAPS (69), two 3/8 X 117mm BOLT S
(104), four 3/8” SAE WASHERS (66), four 3/8” RH W ASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIG-
URE 2. (NOTE: The two 3/8 X 117mm BOLTS (104) for this step are in the LEG PRESS hardware bag.)
104 3/8 X 117mm
65
69
66
67
10
85