STEP 1:

FIGURE 1
6
LOOSELY assemble the LAT/LOW FRAME (14) to the TOWER BASE (10) using four RH CAPS (69), two 3/8 X 97mm BOL TS (59),
four 3/8” SAE WASHERS (66), four 3/8” RH W ASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 1.
10
69
14
66
67
65
3/8 X 97mm 59
01
1/2 1/2 1/2 1/2 1/2 1/2
23456
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150