28

STEP 31:

FIGURE 31
51 3/8 X 43mm
73
65
26
66
10
• Route the MULTI PRESS CABLE (73) under the weight stack and through the bracket on the TOWER BASE (10) and assemble
one 4-1/2” PULLEY (26) to the TOWER BASE (10) using two 3/8 X 43mm BOLTS (51), four 3/8” SAE W ASHERS (66) and two 3/8”
LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 31.