Lochinvar 50-210 Sequence of operation continued, Operation, Display, Service Manual

Models: 50-210

1 44
Download 44 pages 18.94 Kb
Page 12
Image 12
Sequence of operation (continued)

Service Manual

1Service

Sequence of operation (continued)

Table 1A (continued from previous page) Sequence of operation - space heating and DHW

 

OPERATION

DISPLAY

 

 

8. If the DHW thermostat remains on for more than 30 minutes,

 

 

and the space heating call for heat is also on, then the control

BLR: SH 41% RATE

 

will turn on the boiler pump, turn off the DHW pump after 2

 

seconds, and resume modulating based on the space heating

 

set point. As long as both the space heating and DHW calls for

OUT: 123.0F(129)

 

heat remain active, the control will switch back and forth

 

 

between the two modes until one of them is satisfied.

 

 

 

9. Once both calls for heat are satisfied, the control will turn off the

BLR: POSTPURGE

 

burner. The blower will remain on for the 10 second postpurge

 

cycle. Any pumps that are running will continue to run for their

OUT: 127.4F(129)

 

respective pump delay times, then turn off.

 

 

 

10.

Boiler pump off, system pump continues its delay if longer.

BLR: Standby

 

 

OUT: 124.7F(129)

11.

System pump off.

BLR: Standby

 

 

OUT: 122.9F(129)

Manual background 12 Manual background

Page 12
Image 12
Lochinvar 50-210 service manual Sequence of operation continued, Operation, Display, Service Manual