4.Remove the 3 screws (G), 2 screws (H), 2 screws (I), 2 screws (J), 2 screws (K) and 1 screw (L) from the top case.

Screw (G) : DXQT2+E6FNL (N13)

Screw (H) : DXQT26+D8FCL (N16)

Screw (I) : DXQT2+E6FCL (N12)

Screw (J) : DFHE5025XA (N1)

Screw (K) : DXQT2+E12FNL (N11)

Screw (L) : DXQT2+E6FNL (N13)

Screw (H) Disc Cover

Screw (I) Screw (I)

Screw (G)

Screw (K)

Screw

 

 

 

 

 

(H)

 

 

Screw

 

 

(G)

 

 

Screw

 

 

(K)

Screw (J)

Screw

(S)

Screw (J)

Screw (G)

5.Lift up the top case, remove the pad FFC and then remove the top case.

Top Case

9.2.5. Removing the SW Board

Preparation : perform the section 9.2.1. to 9.2.3. first.

1.Peel off the tape.

2.Remove the solenoid cable.

3.Remove the 1 screw (M) and then remove the SW board.

Screw (M) : DXHM0057ZA (N7)

Note:

Note it that the disc eject knob comes off at the same time.

Tape

Top Case

Screw (Q)

Switch Board

Disc Eject Knob

Solenoid Cable

FFC (PAD)

FFC (SW)

27

Page 27
Image 27
Matsushita CF-W5LWEZZ1 2 Removing the SW Board, Preparation perform the .2.1. to 9.2.3. first, Ffc Pad Ffc Sw