Safety work

LAN cable in the pin is processed. Do not run aground to the pin.

Safety work

LAN cable in the pin is processed. Do not run aground to the pin.

The flaking off paper of sheet is peeled off, sheet is put on bottom and the cable is fixed.

Safety work

The cable is processed

Safety work

Processing of pin to the under

Do not run aground to the pin.

RJ cable sheet

A remaining amount is affixed on an opposite side.

Safety work

Do not run aground to the pin.

The cable is rolled and a two sided tape is put.

 

 

Safety work

 

 

 

 

 

 

 

 

 

Do not run

Safety work

 

 

aground

 

 

 

Do not run

 

 

to the pin.

aground

 

 

 

 

 

 

Safety work

to the pin.

 

 

 

 

 

 

Do not run aground to LAN co-

nnector

Neither WAN cable nor LAN cable must come in succession.

to the cutting lack part.

Connector connection

Refer to the putting specification of the tape to figure A.

Safety work

 

LAN cable is processed

Safety work

in the pin.

 

 

 

Processing of board

to the under

 

Safety work

Be sure to bond a two sided tape picking

the board and the cable when you fix the tape.

figure A

fixes with the tape by processing the cable internally.

72

Page 72
Image 72
Matsushita CF-W5LWEZZ1 2 service manual Do not run aground to the pin