9.3. Reassenbly instructions

9.3.1. Attention when CF-W5L series is repaired

-Please execute writing BIOS ID when you exchange the main board.

-Parts (sheet and rubber) etc.related various the conductive cloth and heat spreader cannot be recycled.Use new parts.

9.3.2.Assembly knowhow of the LCD

9.3.2.1.Assembly of the LCD Front

Affixation of LCD rubber / LCD BATT rubber / LCD BATT rubber

Put in the

LCD rubber

 

 

 

length wall

 

 

Width:Largeness

Width:Smallness

 

LCD front Wan

 

 

Paste side

LCD front

Be parallel after Affixes

Affixes between ribs

 

 

LCD rubber

 

 

LCD side rubber

 

Running aground do not be in a surrounding rib

The above drawing

The LCD rubber must not come in succession mutually.

Running aground do not be in a surrounding rib

Drawing in the under

The space among is 0.4-0.6mm.

 

 

LCD side rubber

 

 

LCD front panel

LCD BATT rubber

Running aground do not be in a surrounding rib

36

Page 36
Image 36
Matsushita CF-W5LWEZZ1 2 service manual Assembly knowhow of the LCD, Assembly of the LCD Front