9.3.5.5. Putting Tape and Sheet

FFC bend part

Processing

Conduction cloth is processed

edge standard

between bosses

straight next to the boss.

 

The part where conduction

 

 

 

 

cloth comes in succession

 

 

 

 

is firmly suppressed.

 

Screw

B oth sided tape

 

 

 

 

 

 

The position of a red line

 

 

 

 

puts out the position with

 

 

 

 

a treatment device.

 

 

 

 

A remaining amount

 

 

 

 

 

 

 

 

 

 

 

 

is inserted under the

 

 

 

 

 

 

substrate.

Processing in the vicinity

 

 

 

(Contact prevention

 

 

 

with drive spacer)

of Bottom difference root

 

 

Fixes while installed in the

 

 

Conduction cloth

 

 

 

 

 

FFC positional putting out

 

Antenna board R

treatment device.

 

 

 

 

 

Slack is processed under the tape.

A both sided tape is fixed while installed in the

FFC positional putting out treatment device.

Boss central standard

 

 

 

 

 

 

Refer to the affixation

 

 

 

 

 

 

specification to Figure 2

 

 

 

 

 

 

The coaxial cable is processed

 

 

 

 

 

 

between the battery and the boss.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Convex side

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Boss central

Refer to

 

Fixation after processing

 

standard

 

not put on convex side of

 

 

 

 

Figure 1

 

bottom is done

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Affixation matched to plinth

 

 

 

 

 

externals (left chart red line)

 

 

 

 

 

A curved surface side is affixed

 

 

 

 

 

to bottom case.

 

 

Figure 1

Installation placed

Fixes with the tape after

 

 

 

between bottom case

the cable is processed below.

Safety work

 

 

 

(Securing of drive and clearance)

 

 

 

 

 

 

 

 

Figure 2

A remaining amount is inserted

 

 

 

under the substrate.

 

 

Do not process the cable under

 

 

MIC,H/P jack.

 

 

Modem connector installation

Inserts in positioning pin.

USB board installation

Safety work

Processing which passes side of connector Slack is lost by processing the cable in the direction of the arrow when slackening.

Inserts in positioning Pin.

The PET tape wrapping part

 

The cable is drawn

of modem cable is processed

 

out straight.

to the part HDD FPC.

 

RJ cable sheet

 

 

 

 

 

 

Safety work

 

 

 

 

 

 

 

 

 

 

 

Processing of boss

 

 

Safety work

 

to inside

 

 

 

 

The cable must not

 

 

 

 

 

Processing of pin

run aground on the boss.

 

to inside

 

USB cable

 

Modem cable : Under

spacer

 

USB cable : Upper

 

 

 

 

Processing of pin to inside

Safety work

 

 

 

Modem cable : Under

 

 

 

 

USB cable : Upper

 

 

 

 

Modem cable is prevented

from running aground to the boss. Cable positional accuracy is put out about this size with a cable positioning treatment device.

Bottom corner standard Putting

71

Page 71
Image 71
Matsushita CF-W5LWEZZ1 2 service manual Putting Tape and Sheet, Treatment device