9.3.2.9. Line processing LCD Cable

The built-in order

Peel off the LCD sheet

m

The built-in order

PET tape

Safety Work Overlaps on the connector and affixes

Connector connection

A blue, white line is prevented from lying on top of one another

The cable is processed to the LCD frame clamping

The built-in order

A red line of the cable is matched to the LCD frame externals

After LCD sheet is turned over and conductive cloth is put, a both sided tape is put.

Connector

Externals edge match

PET tape

Insulation sheet edge match

Conductive cloth

Safety Work

All the signal lines are

processed the conductive cloth internally.

Connector and conductive cloth wrapping part, it affixation is surely kicked.

(The cable side is picked up and affixed)

PET tape is processed in parallel to the conductive cloth.

PET tape is put with along LCD of the cable.

Safety Work

The cable is prevented being processed on damper.

The room not done to the state is given.

42

Page 42
Image 42
Matsushita CF-W5LWEZZ1 2 Line processing LCD Cable, Cable is processed to the LCD frame clamping Built-in order