McDATA 8832 warranty Preparatory Steps, Network Configuration

Models: 8832

1 54
Download 54 pages 35.19 Kb
Page 8
Image 8

IBM BladeCenter Deployment Guide

Installation and Configuration

2 Preparatory Steps

The BladeCenter Chassis components should be prepared by updating the firmware and assigning the appropriate IP addresses to the management and switch modules. The IP addresses of the various modules as well as the userids and passwords for each will be needed during the installation. A sample worksheet can be found in 1.Appendix A.

The operating systems that are supported in BladeCenter boot from SAN configurations are Linux RedHat Advanced Server 2.1, 3.0 and 4.0; Microsoft Windows 2000 (W2K) Advanced Server, Microsoft Windows 2000 Server, Microsoft Windows 2003 (WS03) Enterprise Edition, Web Edition and Server.

Note: Since the storage subsystem provides multiple paths to the server, multiple views of the same logical disk will be presented. Multipathing software controls these multiple views by interposing between the operating system and the hardware. Since the multipathing software is not available for the initial boot, only one path may be presented to the server for the initial boot. This process is described in detail later in this document.

2.1 Network Configuration

The two switch modules provide redundant paths to each of the server blades for reaching other server blades within the same chassis or for communication to external devices via the network infrastructure. (Figure 2 BladeCenter internal network) The Ethernet switch modules can be managed via telnet or a Web interface. Both the Web and telnet interfaces can be started by accessing the switch directly or starting a session from the management module’s Web interface.

Note: The external ports on the switch must be enabled, and enabled for management as well, to manage the switch directly without going through the management module. Because the management interface is on VLAN 4095 and cannot be moved, a separate interface from the management interface must be created with an IP address valid on the production network to manage the switch directly.

Figure 2 BladeCenter internal network

8

http://w3-03.ibm.com/support/techdocs/atsmastr.nsf/WebIndex/WP100564

© 2006 IBM Version 3.0, 3/10/2006

The BladeCenter Deployment Guide is intended as a personal productivity tool. It is not intended to be comprehensive and is provided for

guidance only, on an 'as is basis' without warranty of any kind. Please be aware that its contents have not been certified by IBM.

Page 8
Image 8
McDATA 8832 warranty Preparatory Steps, Network Configuration