Miller Electric Metro 250D manual Run-In Procedure, Wetstacking, Heavy loading during first

Models: Metro 250D

1 64
Download 64 pages 40.35 Kb
Page 40
Image 40

9.Run-In Procedure

9.1Wetstacking

Y Heavy loading during first 50

runin2 12/96

 

hours will damage engine.

 

Keep load less than

225A

 

(weld) or 7 kVA (power) for

 

first 50 hours.

 

2

. Do not idle engine longer than

 

necessary. Piston rings

seat

 

faster if engine runs at weld/

 

power rpm, and the welding

 

generator is kept loaded during

 

run-in.

 

 

1Welding Generator

2Engine Exhaust Pipe

Wetstacking is unburned fuel and oil in the exhaust pipe and occurs during run-in if the engine is run too long at light load or idle rpm.

If exhaust pipe is coated with a wet,

 

black, tar-like substance, dry the

1

engine using one of the following

 

run-in procedures.

 

See the engine manual for addition- al engine run-in information.

36

OM-402

Page 40
Image 40
Miller Electric Metro 250D manual Run-In Procedure, Wetstacking, Heavy loading during first