INSTALLATION FOR VERTICAL TERMINATION

VENT INSTALLATION

INSTALLATION FOR VERTICAL TERMINATION

1.Determine the route your vertical venting will take. If ceiling joist, roof rafters or other framing will obstruct the venting system, consider an offset. See Figure 30 to avoid cutting load bearing members.

For optimal flame appearance, a restrictor disk is necessary on straight vertical runs of 20' of more.

Runs may not incorporate elbows.

The disk is part number 45D0551 and is included in instal- lation manual packet.

Drop the disk into a 4" inner collar before installing the first section of flue or install at the last section before installing the termination.

An additional disk may be installed on runs of 35' or more. Rotate disks perpendicular to each other.

NOTE: Pay special attention to these installation instructions for required clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, etc. Do not pack air spaces with insulation. Also note maximum vertical rise of the venting system and any maximum horizontal offset limitations. Offsets must fall within the parameters shows in Figure 13, page 20.

2.Set fireplace in desired location. Drop a line plumb down from the ceiling to the position of the flue exit. Mark the center point where the vent will penetrate the ceiling. Drill a small locating hole a this point.

Drop a plumb line from the inside of the roof to the ceiling locat- ing hole in the ceiling. Mark the center point where the vent will penetrate the roof. Drill a small locating hole at this point.

FLAT CEILING INSTALLATION

1.Cut a 91/2" (241mm) square hole in the ceiling using the locating hole as a center point The opening should be framed to 91/2"x91/2" (241mm x 241mm) inside dimensions as shown in Figure 32using framing lumber the same size as the ceiling joist. If the area above the ceiling is an insulated ceiling or a room, nail firestop from the top side. This prevents loose insulation from falling into the required clearance space. See Figure 31. Otherwise, install firestop below the framed hole. See Figure 32.

2.Assemble the desired lengths of pipe and elbows necessary to reach from the burner system flue up through the firestop. Be sure pipe and elbow connections are fully twist-locked. See Figure 15, page 18.

Roof

Flashing

Wall FLAT CEILING INSTALLATION

Strap

45° Elbows

Figure 30 - Offset with Wall Strap and 45° Ceiling Firstop

Figure 30 - Offset with Wall Strap and 45°

Elbows

Nails

Firestop

Figure 31 - If Area Above is a Room, Install Firestop above Framed Hole as Shown

 

1

/

2"

91

9

 

 

/

 

 

 

"

 

 

 

 

2

 

 

 

 

 

Nails Figure 32 - If Area Above is Not a Room, Install Firestop

Figure 32 - If Area Above is Not a Room, Install