FIELD LEVEL TEST MODES AND PROCEDURES: Required Test Equipment

The following tests are performed in test mode:

TX Power Test

BER Tests 800BER1 800BER2 800BER3 800BER4 900BER1 900BER2 900BER3

NOTE: The Power, MPX, and MOD test parameters are for factory use only and should not be adjusted by field service personnel. The default values for these parameters are as follows:

Power: 0 dB

MPX: 1:6

MOD: QAM16

8.2Required Test Equipment

Use the following list to identify the test equipment required to perform the technician tests. Refer to the appendix for test equipment part numbers and descriptions.

Battery eliminator

Data cable RS232 or USB data cable

R-2660 Digital Communications System Analyzer

RF Adapter

Variable 5.0 to 12.0 Vdc power supply (3.0 A capability)

8.3Field-Level Test Checklist

Use the following test checklist to ensure that all the necessary tests are performed and to provide a tracking mechanism in case the unit is sent to the next level of service.

Check the appropriate box for each test performed and indicate whether or not the test was completed successfully.