FIELD LEVEL TEST MODES AND PROCEDURES: SQE Test

8.5SQE Test

Use this test on a unit having any of the following symptoms: No service failures or poor SQE/ RSSI (poor performance in known good coverage area).

Set up the R-2660 for iDEN

Mobile operation, and connect the

unit to the RF IN/OUT

connector. See Figure 7-1 on page

7-3.

Notes:

1.Watch unit for resetting during this procedure.

2.Master reset can be completed on the unit by pressing Menu, Settings, Security.

3.Registration and calls might take over 1 minute to complete.

4.See the Strong Signal Environment section in Chapter 7.

 

 

Connect the regulated battery

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

eliminator to the unit to be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tested. Remove the antenna

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

from the unit. Set the power

 

 

 

 

 

 

Power

 

 

 

 

 

 

 

 

 

 

 

 

 

supply 4.0 Vdc.

 

 

 

 

 

up the unit. Enter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Initial Registration mode (see

Fail

 

 

 

 

Perform the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating

 

the R-2660.)

Press Start.

 

 

 

 

 

 

 

Registration/Call

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pass

 

The Call SEQ: 1 thru 6 lights up

 

 

 

 

 

 

 

 

test.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

when unit has

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Verify that

 

 

 

 

 

registered.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SQE Reference Chart

 

 

the unit can complete an

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

interconnect call. Press End/Home

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gen

SQE Level

until the unit displays Ready. Press Intercon-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fail

 

 

 

-70 dBm

>26

 

 

nect (3:1 or 6:1) and Start on the R-2660. Wait

 

for the

 

 

 

 

 

 

 

 

 

 

-80 dBm

>25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

green LED to light. Press Send on the unit.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-90 dBm

>23

 

 

 

 

Note: Leave call connected for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-100 dBm

>20

 

 

 

 

the next test.

 

 

 

 

 

 

Perform the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Registration/Call test.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pass

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Gen levels in the SQE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

chart include RF Adapter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Place unit

 

 

 

 

 

 

 

 

 

 

 

 

 

losses.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

in debug mode (see

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Entering Debug Mode). Press

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Trace to monitor the SQE & TX level.

 

Fail

 

 

 

 

 

 

 

Replace the

 

 

Press RF in the R-2660 and arrow down to Gen:.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Main board.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Verify that it is set to -70dBm.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Verify that the SQE is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

greater than

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

26.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pass

Change

 

 

 

 

 

Gen: to -80 dBm, and

 

 

 

Fail

check the SQE Reference chart to

 

 

 

 

 

 

 

 

 

 

 

 

verify the unit’s SQE per Gen:

 

 

 

 

 

 

 

 

 

 

output using the

 

 

 

 

 

 

 

 

 

 

 

 

 

chart.

 

 

 

Unit passed test. Look for

 

 

 

 

 

 

 

 

 

Pass

 

 

 

 

 

 

system, coverage, accessory, or

 

 

 

 

 

 

 

 

software problems.

 

 

 

 

 

 

 

 

 

 

Replace the Main board.

68P80400P73-A

8-5

Page 84
Image 84
Motorola i860 manual SQE Test, SQE Reference Chart