19
FINISHING
DOOR REMOVAL
Before the glass door can be removed, the optional front must be removed.
The glass door is secured to the top front edge of the firebox with two latches. Pull the handles of the latches forward, then lift the hooks out from the slots in the door frame to release the top of the door. Next, pivot forward until the top edge of the door clears the front of the fi replace. Next gripping the sides of the door lift the door out
from the retainer along the bottom of the door.
LOG SHIPPING BRACKET
FIGURE 38
FIGURE 37
LATCHES
GLASS
DOOR
OPTIONAL | RETAINER |
FRONT |
|
Before installing the logs, you must fi rst remove the log shipping brackets. Lift up to remove.
LOG SHIPPING
BRACKET
DECORATIVE BRICK PANEL INSTALLATION
Decorative panels may discolor after time.
1.Carefully remove the glass door and all logs. (Refer to the “FINISHING” section)
2.Remove the two screws holding the front portion of the rear air defl ector. Remove the pilot shield by removing the two screws as
illustrated. (Fig. 40)
STEP
#2
PILOT SHIELD
3.Remove the 3 screws holding the burner down and carefully remove the burner. (Fig. 41)
4.Install the right brick panel by sliding the bottom edge of the panel down the right fi rebox side then pivot the top edge of the panel into place against the fi rebox wall. Hold in place with the brick retainers.
(Fig. 41)
STEP
#3
FIGURE 42
5.Rest the bottom edge of the rear panel on top of the rear portion of the air defl ector at the back of the fi rebox and push into place. The rear panel is held in place when both side panels are in position.
6.Install the left brick panel using the same method described in step 4.
7.Replace
the burner, air defl ector, logs and glass door.
1 2 3
FIGURE 43
HERRINGBONE PATTERN ILLUSTRATED
Note: Due to the brittle material of the bricks, care must be
taken not to bend or force them into place.
Note: Refractory panels require a 24 hour curing period on a
low flame.
FIGURE 41