NCR RealScan 7882 Installation and Owner Guide

Checkstand Cutout

1.Put the RealScan 7882 into the hole in the checkstand. Diagrams in NCR RealScan 7882 Specifications show the various dimensions of the hole.

2.Align the RealScan 7882 to the Checkstand. The leading edge of the Top Plate must be flush or up to 1/16 in. (0.15 cm) below the top of the checkstand. The trailing edge of the Top Plate must be flush or up to 1/16 in. (0.15 cm) above the top of the checkstand.

Low Surface

High Surface

Low Surface

High Surface

 

Correct Alignment

 

Bad Alignment

Scanner Too High

Bad Alignment

 

Scanner Too Low

14231

Checkpoint Cable

If you are installing a RealScan 7882 Scanner with the Checkpoint feature on a Vertical Mounting Bracket, route the Checkpoint Cable along side the Interface Cable.

Note: If the installation includes the Checkpoint feature, a representative from Checkpoint must connect the Checkpoint Cable to the Checkpoint equipment after you install the RealScan 7882.

Cable Clamps

The RealScan 7882 is supplied with two Cable Clamps (006-0687102). Install these clamps under the checkstand as needed to support the cables and keep them out of the operator’s way.