Nilfisk-ALTO 692003 Machine Preparation, American-Lincoln, 1-19, Smart, Battery Installation

Models: 692003

1 60
Download 60 pages 17.92 Kb
Page 19
Image 19
BATTERY INSTALLATION

MACHINE PREPARATION

BATTERY LEVER

Fig 5

LOCK BATTERY IN PLACE WITH LEVER

Fig 6

CONNECTING BATTERY

Fig 7

MACHINE POWER CONNECTOR

BATTERY POWER CONNECTOR

Fig 8

BATTERY INSTALLATION

1.Lift the machine front cover.

2.Rotate the battery lever to the right.

3.Lower the battery into place using a 2000 LB. (907 KG) capacity lifting device.

4.Rotate the battery lever to the left to lock the battery into place.

5.Connect battery wires according to manufacturer’s direction.

6.Connect the battery power connector to the machine power connector.

7.Lower the machine front cover into place.

1-19 WARNING

Do not leave charged batteries on concrete surface, they will discharge.

AMERICAN-LINCOLN

1-19

SMART

 

Page 19
Image 19
Nilfisk-ALTO 692003 manual Machine Preparation, American-Lincoln, 1-19, Smart, Battery Installation