Nortec NH Series Check Lists, A.Pre-Norteconline Start Up Checklist Wiring, Network Connection

Models: NH Series

1 92
Download 92 pages 17.56 Kb
Page 78
Image 78
2.CHECK LISTS

2.CHECK LISTS

A.PRE-NORTEC ONLINE START UP CHECKLIST WIRING

(1)Humidifier-to-Humidifier Connection:

Each individual Humidifier linked to lead Unit.

Connection can be direct or daisy-chained to other units.

(2) Network Connection:

Lead Unit wired to Local Network (Ethernet, GPRS, Dial-up).

Network activity verified.

(3) Controls Wired:

Directly to humidifiers.

(4) Start-Up Procedure:

Ensure power is being supplied to the humidifier and Nortec Online Module.

Verify power to NetBiter (Power LED should be lit).

After power-up, verify network communication.

Verify variable operation after mapping is complete.

Perform regular humidifier start-up check.

B. PRE-NORTEC LINKS START-UP CHECKLIST

 

(1)

Humidifier-to-Humidifier

(4)

Start-Up Procedure:

 

Connection:

 

Verify power to NORTEC Links

 

 

 

 

Each individual Humidifier linked

 

module.

 

to lead Unit.

 

Verify power to I/O-Controller.

 

Connection can be direct or

 

 

 

Adjust Network address dials to

 

daisy-chained to other units.

 

 

 

desired address (BACnet/IP

 

 

 

(2)

Network Connection:

 

address is preset at factory).

 

Lead Unit wired to Local BMS.

 

After power-up, verify network

 

Network activity verified.

 

communication.

 

 

Map desired network variables to

(3)

Controls Wired:

 

 

BMS.

 

Directly to humidifiers.

 

 

 

Verify variable operation after

 

 

 

mapping is complete.

Perform regular humidifier start- up check.

10-50