Nortel Networks 2750 manual Verifying a successful installation

Models: 2750

1 108
Download 108 pages 23.09 Kb
Page 39
Image 39

Chapter 2 Cabling the VPN Router and turning the power on 39

Verifying a successful installation

After you connect the gateway to the power source and turn it on, you can verify a successful installation by checking the light emitting diodes (LED) on the front panel (Figure 8 on page 40).

The following sequence of LEDs should occur:

1The power LED (the Nortel logo) lights blue.

2The Alert LED lights red, and the Boot/Ready LED lights green.

3The Boot/Ready LED lights yellow, and the Alert LED turns off when the gateway begins its boot sequence.

4The Boot/Ready LED lights green to indicate that the gateway is operational after the boot process is complete.

5The Alert LED lights yellow because the gateway is not configured.

For a newly installed VPN Router 2750, a yellow Alert LED does not indicate an alarm condition. After you configure the gateway, the Alert LED turns off. (See Chapter 3, “Configuring the management IP interface,” on page 53.)

If the LEDs on the front panel light in this sequence, your installation is successful. If the LEDs do not light in this sequence, check that you correctly installed the bezel on the gateway and that you properly attached the power cord to the power supply (see “Connecting the power cord” on page 37).

If the VPN Router 2750 still does not boot, contact your local Nortel Technical Solutions Center (see “How to get help” on page 17).

Nortel VPN Router Installation — VPN Router 2750

Page 39
Image 39
Nortel Networks 2750 manual Verifying a successful installation