Panasonic service manual Servicing Mode, 14.1 CU-2E18NBU

Models: CU-2E18NBU

1 57
Download 57 pages 29.38 Kb
Page 27
Image 27
14. Servicing Mode

14. Servicing Mode

14.1 CU-2E18NBU

14.1.1Pump down operation (SW1)

šOperate the pump down process according to the following procedure o Confirm the valve on the liquid side and gas side are open.

o Press PUMP DOWN button (SW1) on the Service PCB inside the outdoor unit for more than 5 seconds. Pump down (cooling) operation is performed for 15 minutes.

o Set the liquid side 3 way valve to close position and wait until the pressure gauge indicates 1.45PSI (0.1kg/cm2G).

o Immediate set the gas side valve to close position and then press the PUMP DOWN button (SW1) to stop the pump down operation.

NOTE: Pump down operation will stop automatically after 15 minutes if PUMP DOWN switch (SW1) is not pressed again. Pump down operation is not started within 3 minutes after compressor is stopped.

LED

2

3

4

5

Message

 

 

 

 

 

 

 

 

 

 

 

Pump down operation in progress

 

 

 

 

 

 

Status

 

 

 

 

3 minutes before operation end

 

 

 

 

 

 

 

 

 

2 minutes before operation end

 

 

 

 

 

 

 

 

 

1 minute before operation end

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pump down operation end

 

 

 

 

 

 

14.1 CU-2E18NBU: Flashing

14.1.2Test Run operation

šTest operation can be carried out using TEST OPERATION button (SW2) on the Service PCB inside the outdoor unit.

šFor Cooling test, press the TEST OPERATION button (SW2) for 5 seconds or more but less than 10 seconds, LED1 and LED 2 will illuminate when shift into cooling test operation.

šFor Heating test, press the TEST OPERATION button (SW2) for more than 10 seconds, LED 1 and LED 3 will illuminate when shift into heating test operation.

šPress the TEST OPERATION button (SW2) again to cancel test operation.

27

Page 27
Image 27
Panasonic service manual Servicing Mode, 14.1 CU-2E18NBU