Panasonic PT-F300N Time settings, Email settings, Connection test, Using WebBrowser cont

Models: PT-LB51NT PT-LW80NT TH-LB60NT PT-F200NT TH-LB50NT TH-LB55NT PT-FW300NT PT-F300N PT-F100NT

1 69
Download 69 pages 13.54 Kb
Page 60
Image 60
 Time settings

Using WebBrowser (cont.)

 Email settings Time settings

Click [Detailed set up]→[Adjust clock] in the menu.

Time zone: Select the time zone and click [Set time zone].

Time

: Enter the current date and time in

 

[Date] and [Time], and then click [Set

 

date and time].

 Connection test Email settings

You can specify two email recipients.

Click [Detailed set up]→[E-mail set up] in the menu.

• [MAIL SERVER]

 

ENABLE

: Enable or disable email transmission.

SMTP SERVER NAME

: Enter the SMTP server name.

• [MAIL OPTION]

 

MAIL FROM

: Enter the sender’s email address.

MEMO

: Enter a description of the sender.

• [TEMPERATURE WARNING SET UP]

MINIMUM TIME: Enter the interval for sending email.

INPUT AIR TEMPERATURE : Select the temperature of the intake sensor at which to send a warning message.

[E-MAIL ADDRESS]

 

E-MAIL ADDRESS

: Enter the email addresses of the

 

recipients.

MAIL CONTENTS

: Change the type of message as

 

desired.

 

When sending messages to mobile

 

phones, select “SIMPLE.”

ERROR

: Select ON to send email when errors occur.

LAMP RUNTIME

: Select ON to send email when “at REMAIN” is reached.

FILTER REMAINING TIME

: Select ON to send email when “at REMAIN” is reached.

INPUT AIR TEMPERATURE : Select ON to send email when the temperature set in [TEMPERATURE WARNING SET UP] is

 

exceeded.

PERIODIC REPORT

: Send a message with the projector status at the selected date and time.

When [submit] is clicked, the settings are applied.

Manual background Connection test

You can confirm if a network connection is established with Mail server, POP server, DNS server or the like.

Click [Detailed setup] → [Ping test] from the network main menu.

Destination IP address: Enter the IP address of the server you want to test, and then click [Submit].

If succeeded in connection, the following display appears.

If failed in connection, the following display appears.

60

Page 60
Image 60
Panasonic PT-F300N, TH-LB50NT, TH-LB55NT, TH-LB60NT Time settings, Email settings, Connection test, Using WebBrowser cont