G

 

26

 

AE

1/2 X 3-1/2”

6

FIGURE 22

STEP 22:

SECURELY assemble the PRESS ARM ADJUSTMENT (G) to the PRESS LOAD ARM (AE) using one 1/2 X 3-1/2” BOLT (6) and one 1/2” LOCK NUT (26) as shown in FIGURE 22.

 

19 3/8 X 1/2”

FIGURE 23

 

G

 

 

24

 

I

 

 

36

AH

 

29 3/4” JAM NUT

 

 

STEP 23:

SECURELY assemble the PRESS ARM ADJUSTMENT (G) to the PRESS ARM (I) and the PRESS ARM ADJUSTMENT TUBE (AH) using two 3/4” JAM NUTS (29) and two 1/4” SPACERS (36) as shown in FIGURE 23.

SECURELY assemble one 3/8 X 1/2” BOLT (19) and one SPRING WASHER (24) to the PRESS ARM ADJUSTMENT (G) as shown in FIGURE23

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

21

Page 21
Image 21
ParaBody GS6 manual X 3-1/2