(a)

 

 

 

 

 

28

 

 

 

 

28

 

 

 

 

 

52 3/8 X 2-1/4”

 

 

 

 

 

31

 

 

 

 

 

49

 

 

 

 

 

C

 

 

 

 

 

 

 

C

 

 

 

 

AE

28

 

49

32

(b)

 

C

 

 

 

 

 

52 3/8 X 2-1/4”

 

 

 

 

23

 

49

 

17 3/8 X 1-3/4”

 

 

33

 

 

 

 

 

 

 

3/8 X 3-1/2” 12

A

 

 

 

51

3/8 X 3” 14

 

 

 

 

49

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

F

 

 

 

 

 

28

 

 

 

 

 

(c)

 

 

 

 

 

15 3/8 X 2-3/4”

FIGURE 29

 

 

 

 

 

STEP 29:

Assemble one 3-1/2” PULLEY (49) to the bracket on the BASE (A) using one 3/8 X 2-1/4” BOLT (52),one 3-1/2” PULLEY GUARD (C), one 3/8” SPACER (31) and one 3/8” LOCK NUT (28). See FIGURE 29(a) (Note: Loop the LOW CABLE (45) around the

PULLEY prior to assembling the PULLEY to the BASE .)

Assemble one 3-1/2” PULLEY (49) to the tube on the BASE (A) using one 3/8 X 3” BOLT (14), one 3/8 WASHER (23) one 3-1/2” PULLEY GUARD (C), one 13/32“ SPACER (33) and one 3/8” LOCK NUT (28). See FIGURE 29(b) (Note: Loop the LOW CABLE (AW) around the PULLEYprior to assembling the PULLEYto the BASE .)

Assemble one 3-1/2” PULLEY (49) to the PRESS LOAD ARM (AE) using one 3/8 X 3-1/2” BOLT (12), one 3/8 WASHER (23)

one 3-1/2” PULLEY GUARD (C) and one 3/8” LOCK NUT (28). See FIGURE 29(b) (Note: Loop the LOW CABLE (AW) around the

PULLEYprior to assembling the PULLEYto the PRESS LOADARM .)

Assemble one 3-1/2” PULLEY (49) and one 3-1/2” PULLEY GUARD (C) to the BASE (B) using one 3/8 X 2-1/4” BOLT (52), one 3/8 X 7/16” SPACER (33) and one 3/8” LOCK NUT (28). See FIGURE 29. (Note: Loop the LOW CABLE (AW) around the PULLEYprior to assembling the PULLEY to the BASE.)

Route the LOW CABLE (AW) around one 3-1/2” PULLEY (49) and assemble to the horizontal bracket on the FOOT FRAME (F) using one 3/8 X 1-3/4” BOLT (17), one 3-1/2” PULLEY GUARD (C) and one 3/8” LOCK NUT (28). See FIGURE 29(c)

Route the LOW CABLE (AW) under one 4-1/2” V-GROOVE PULLEY(51) and assemble the 4-1/2” V-GROOVE PULLEY(50) to the vertical bracket on the FOOT FRAME (F) using 3/8 X 2-3/4” BOLT (15) and one 3/8” LOCK NUT (28). See FIGURE 29(c)

27

Page 27
Image 27
ParaBody GS6 manual Pulley prior to assembling the Pulley to the Base