4. Configuration
4-18 March 2001 3160-A2-GB24-10
Procedure
To select the link layer protocol:
1. From the top-level menu screen, select Cnfig.
2. Select the configuration option set to be copied into the Edit ar ea by using the
appropriate Function key. Use the scroll keys, if necessary.
3. Select Edit.
4. From the Edit screen, press the key until the Mgmt selection appears on
the screen.
5. Select Mgmt.
6. From the Mgmt Config screen, select Gen.
7. Press F1 (Next) until the Com Link configuration option appears.
8. Press F2 (PPP) or F3 (SLIP).
F1 F2 F3
Edit:
User Alarm Mgmt
F1 F2 F3
Mgmt Config:
Gen Trap
F1 F2 F3
Com Link:
Next PPP SLIP