Patton electronic 2621, 2635 manual Click on Create

Models: 2635 2621

1 133
Download 133 pages 40.62 Kb
Page 56
Image 56
6.Click on Create.

Models 2603, 2621, and 2635 Getting Started Guide

6 • WAN Services

 

 

6.Click on Create.

Figure 31. Edit IP address of WAN port

7.Click on Services Configuration > IP Routes > Create new Ip V4 Route. Create the gateway to the remote router by entering the WAN IP address of the remote router, in this example, enter 192.168.164.3 in the Gateway field. (See figure 32.)

8.Click the Update button.

Figure 32. Configuring the gateway

The other fields should be:

Destination: 0.0.0.0

Gateway: 192.168.164.3

Mask: 0.0.0.0

Cost: 1

Interface: [blank]

You can see the status of the PPP link by going to the ‘Edit PPP’ web page and paging down until you see the “Summary” description. In figure 33 the PPP link is in the Establishment phase. To get to the ‘Edit PPP’ web page, follow this path: Services Configuration > WAN > Edit... > Edit ‘PPP’

WAN Service Configuration

56

Page 56
Image 56
Patton electronic 2621, 2635 manual Click on Create