46
SunTouch Pool and Spa Control System Installation and User’s Guide
Front panel
retaining screw
Front panel
Preparing the SunTouch Power Center
Before mounting the SunTouch Power Center, first open the front door and the front panel to access the
conduit knockouts and low voltage raceway.
Opening the front panel
To access the SunTouch Power Center electronics compartment:
1. Unlatch the front door,
2. Loosen the retaining screw on front panel. Open the hinged front panel to access the electronics
compartment.
3. Proceed with:
•Mounting the SunTouch Power Center, page 47
•Removing Electrical Conduit Knockouts, page 48
•Installing Conduit and Wire to the SunTouch Power Center, page 49
•Transformer Connections, page 50
•SunTouch Motherboard Connections, page 51
4. After all electrical connections have be completed, close the front panel and secure it with the
retaining screw.
SunTouch Power Center (Shared Equipment System)