Pentax installation manual For N-0751M-OD, 0.3m, 0.9m

Models: N-0751M-OD N-0751M

1 60
Download 60 pages 58.01 Kb
Page 11
Image 11
[ For N-0751M- OD]

[ For N-0751M- OD]

Maintain the following clearances to any opening in any building:

Illustration

 

 

• 0.3m (1') below, 0.3m (1') horizontally from,

Openingto ClearancesOutdoor

 

or 0.3m (1') above any door, operable

 

window, or gravity air inlet into any building.

BuildingAny into

0.9m (3') above any forced air inlet within

3m (10').

 

 

 

• 0.3m (1') below, 0.3m (1') horizontally from,

is

 

or 0.3m (1') above any door, operable

 

window, or gravity air inlet into any building.

Heater

Box

0.9m (3') above any forced air inlet within

3m (10').

0.3m (1') 0.3m

0.3m0.3m (1') (1') 0.9m (3')

0.3m (1')

0.9m (3')

VentClearancesWhen InstalledinaRecess

(recess box installation with cover removed)

0.3m

0.3m (1')

(1')

 

0.3mManual background (1') Manual background

0.9m (3')

*For Installations in Canada, clearances are as follows: To windows, doors, & gravity air inlets: 900mm (36").

To forced air inlets: 1.8m (6').

11

Page 11
Image 11
Pentax installation manual For N-0751M-OD, 0.3m, 0.9m