Horizontal Vent Termination |
|
| |
|
| • | Terminate at least 300mm (12") above |
| Hanger |
| grade or above snow line. |
Elbow | Straps | • | Terminate at least 2.1m (7') above a public |
|
| walkway, 1.8m (6') from the combustion air | |
| Wall | Termination | intake of any appliance, and 0.9m (3') from |
| any other building opening, gas utility meter, | ||
| Slope vent Thimble |
| |
| Downwards |
| service regulator etc. |
|
| • | Terminate at least 0.9m (3') above any |
| **0.3m (1') Min. - |
| forced air inlet within 3m (10'), 1.2m (4') be- |
Appliance | 0.9m (3') Max. |
| low, 1.2m (4') horizontally from or 0.3m (1') |
Adapter* |
|
| above any door, window, or gravity air inlet |
| * Adapter not required when |
| into any building per National Fuel Gas Code |
|
| ANSI Z223.1/NFPA 54. | |
| using Noritz |
| |
| ** 0.3m (1') minimum recommended, | • Slope the horizontal vent 1/4" downwards | |
| but not required. Avoid installing |
| for every 300m (12"). |
| elbow directly on flue. |
| |
|
| • Use a condensation drain if necessary. | |
|
| • In the Commonwealth of Massachusetts a | |
|
|
| carbon monoxide detector is required for all |
Vertical Vent Termination |
| side wall horizontally vented gas fuel equip- | |
| ment. Please refer to Technical Bulletin TB | ||
| Rain |
| |
| Cap |
| 010606 for full installation instructions. |
Storm |
|
|
Collar | Roof | • Terminate at least 1.8m (6') from the combus- |
| ||
| Flashing | tion air intake of any appliance, and 0.9m (3') |
|
| |
Roof |
| from any other building opening, gas utility |
Jack |
| meter, service regulator etc. |
|
|
Firestop/
Support
| Hanger | Firestop |
Elbow | Strap |
|
|
| |
| Condensation |
|
| Drain (Install |
|
**0.3m (1') Min. - | According to |
|
0.9m (3') Max. | Local Codes) |
|
| Appliance |
|
| Adapter* |
|
| * Adapter not required when | |
| using Noritz |
|
| ** 0.3m (1') minimum recommended, | |
| but not required. Avoid installing | |
| elbow directly on flue. |
|
•Enclose exterior vent systems below the roof line to limit condensation and protect against mechanical failure.
•When the vent penetrates a floor or ceiling and is not running in a fire rated shaft, a firestop and support is required.
•Terminate the vent system at least 0.6m (2') above, but not more than 1.8m (6') above the roof line, or according to the vent pipe manufacturer's instructions.
•Terminate the vent system at least 0.6m (2') above any portion of a building located within 3m (10') horizontally.
•Provide vertical support every 3.6m (12') or as required by the vent pipe manufacturer's in- structions.
•Slope the horizontal vent 1/4" for every 300m (12") towards the drain tee.
•Do not vent straight upwards.
Always have a horizontal section of venting.
•Install a condensation drain in the horizontal section of the venting.
14