[ For N-0751M -OD]
Item | Check | |
| • Maintain the following clearance from both combustible | |
| and | |
Heater | * ( ) indicates the distance when installing a heat insulat- | |
ing board (incombustible material other than metal, with | ||
| ||
From | thickness of 2.5mm (0.1") or more) or "section of build- | |
ing effectively finished with incombustible material." | ||
Note, however, that combustion failure may occur to the | ||
ClearancesRequired | unit as exhaust gas reflects from the wall. Provide clear- | |
| ||
| ance of 600mm (24") or more in the front of the unit to | |
| facilitate inspection and repair. |
installation | • | When installing the unit in a common side corridor, provide | |
| (84") from the corridor floor. | ||
|
| a clearance of 1175mm (47") or more in front of the unit. | |
| • Set the bottom edge of the exhaust port about 2100mm | ||
ofarea | • When installing the unit on a balcony, etc., secure an | ||
the | |||
| evacuation route of 600mm (24") or more in width. | ||
Surrounding |
| ||
• Provide clearance of 600mm (24") or more in front of the | |||
| |||
|
| unit to facilitate inspection and repair. Do install the unit | |
|
| such as the wall of the second floor where the unit is out | |
|
| of reach. |
|
| 600mm (24") |
|
combustible |
| (300mm (12")) | combustible |
| or more | ||
|
|
| |
| 10mm (0.4") |
| |
| or more |
| |
| combustible |
| |
combustible |
| 900mm |
|
| combustible | ||
|
| (36") or more | |
|
| 150mm |
|
|
| (6") or more | |
| 150mm |
| |
| (6") or more |
| |
|
| 1175mm (47") |
|
|
| or more |
|
|
| about |
|
| Handrail | 2100mm (84") |
|
| common side |
| |
|
|
| |
|
| corridor |
|
600mm (24")
or more
Handrail
balcony, etc.
8