SpectraLink 6300 MCU: Facility Preparation
Before turning on the power switch, use a voltmeter to verify that the terminal labeled
Install Cards
Cards contain components that may be damaged by electrostatic discharge. Before handling any of the cards, the installer must attach the grounding strap (included in the Administration Kit) to his or her wrist, and attach the other end of the strap to ground. Only handle the cards by their edges. Do not touch connector contact areas, do not lift cards by any of the components, and do not lay cards down on their component sides. When laying a card down, place it component side up on top of the
Install System Controller Card (CSC301, CSC306, CSC320)
Slide the System Controller Card into slots 1 and 2 of the Primary Shelf, until the card clicks into place. Tighten the screws at the top and bottom of the card to secure it.
Install Interface Modules
(CPA, CPU, CPM, CPP, CPF316)
Slide the first Interface Module into slot 3 of the Primary Shelf, until the card clicks into place. Tighten the screws at the top and bottom of the card to secure it.
Slide additional Interface Modules into their slots. Slots can be left empty if desired.
The shelf diagram below shows a fully loaded Primary Shelf. Any type of Interface Module can be installed in slots 3 through 12.
44 | PN: |