System Installation
Facility Analysis
Check the site to be sure
Location chosen for the shelves is adequate.
Rack (if rack mounted) is properly secured or backboard (if wall mounted) is properly prepared.
Power is available.
Wiring to Base Station locations has been pulled and correctly terminated.
Phone lines for the handsets are installed and properly terminated.
Telephone system administrator is
If the work has not been completed, the Polycom Field Service Engineer may leave the site and reschedule the installation when the items have been completed or corrected, or may assist in preparing the site.
Check Components
At the installation site, unpack the system carefully, verify that there is no shipping damage, and store in a safe place. As the field service engineer unpacks, he or she must confirm that contents are correct by comparing with the shipping documents.
Before beginning the system installation, begin charging a handset. The Battery Packs for the handsets are not charged when shipped. At least one fully charged handset is required to test the system.